a) Morganza to the Gulf Reach J-2: Eustis Engineering Services, LLC – Revised
Estimated Cost Proposal for Additional Geotechnical Engineering Services in an
amount not to exceed $27,780.00.
b) Resolution
No. 07-430 in Support of Wetland Sustainability Within
the Morganza to the Gulf Hurricane Protection Project
c) Morganza to the Gulf Reach H-3 – Proposal from GCR &
Associates on Acquisition of Land Rights
d) Morganza to the Gulf – Update
5.
Field
Superintendent’s Report
a)
In-house Projects
and Equipment – Update
b)
Rental of Track
Mounted Crawler Carrier for Lower Ward 7 Levee
c)
Authorization to
Purchase One (1) Bush Hog Tractor on State Contract
6.
Engineer’s Report
a)
Evans-Graves Engineers, Inc.
1) Pointe-Aux-Chene
Floodgate Project - Update
b)
GSE Associates, Inc.
1) Montegut Wetlands
Levee and Structure Repair – Balancing Change Order in the Amount of
$2,243.13.
2) Morganza to the Gulf – Reach J Segment 2
a) Engineering Contract Approval on 10’ High
Levee Design
c)
Morris P. Hebert, Inc.
1)
Lower Petit Caillou Levee Reconstruction Project (TE-07b)
2) Morganza to the Gulf Hurricane Protection Project
a)
Pointe-Aux-Chenes Floodgate Update
b)
Bayou Pointe-Aux-Chenes First Lift Levee System –
Task Order MPH-04, Amendment No. 5
d)
Shaw Coastal, Inc.
1)
SCI Project No. 1624 – Barrier Plan - Bayou Black Levee and Pump Station - Reach
II
2)
SCI Project No. 120942 & 125203 – Ward 7 Levee – Engineering and Construction
a) Change Order No. 1 to Civil Construction Contract –
Time Extension of 75 Calendar Days
to Include a Net
Increase of $48,820.00 to the Contract Price
b) Amendment No. 5 to Shaw Coastal Contract
for Additional Funds for Construction
Administration and Inspection in the amount
of $58,585.00
3) SCI Project
No. 123771 – Reach H, Segment 3, First Lift (H-L-003)
4) SCI Project No. 111838 – Morganza
to the Gulf, Reach H Permitting
5)
SCI Project No. 111837 – Lower Bayou Dularge
Mitigation Plan Implementation
e)
T. Baker Smith & Son, Inc.
1) TBS Project No. 2004.0030 - Forced Drainage Project
– 4-3C West - Project Update
2) TBS Project No. 2004.0029 - Ward 7 Levee Reconstruction
– Project Update
3) TBS
Project No. 2001.0056 - Morganza Reach J-1 Levee and
Floodwall – Project Update
a) J-1
Levee Segment A – Change Order No. 1 for Time Only - 42 Additional Days
b) J-1
Floodwall – Change Order No. 1
(Balancing Change Order $624,953.40 Underrun
c) J-1
Floodwall – Construction Contract Termination
4) TBS
Project No. 2007.1121 - Morganza Program Management
Services – Project Update
7.
President’s
Report
8. Adjourn
___________________________