A
meeting of the Planning & Projects Committee of the Board of
1)
Meeting called to
order
2)
Roll Call
3)
Public Wishing to
Address the Board
4)
Executive
Director’s Report
a) Revised Estimate for the Forced Drainage 4-3C West
Terracing Mitigation Project
b) Morganza to the Gulf – Update
5)
Field
Superintendent’s Report
a)
Montegut
Emergency Repair – Update
b)
Authorization to
Award the Excavator Bid to Quest Construction Equipment
c)
In-house Projects
and Equipment – Update
6)
Engineer’s Report
a)
Evans-Graves Engineers, Inc.
1.
MTG Bayou
Pointe-Aux-Chenes First Lift Levee System Project – Update
b)
GSE Associates, Inc.
1.
Morganza to the
Gulf – Reach J Segment 2 – Project Update
c)
Shaw Coastal, Inc.
1.
SCI Project No.
111837 – Lower Bayou Dularge Mitigation Plan Implementation
2.
SCI Project No.
111838 – Morganza to the Gulf, Reach H Permitting
3.
SCI Project No.
123771 – Reach H-Segment 3 First Lift (H-L-003)
4.
SCI Project No. 120942/125203
– Ward 7 Levee Construction
5.
SCI Project No.
130512 – Upper Ward 7 Mitigation Project
d)
T. Baker Smith & Son, Inc.
1.
TBS Project No.
2001.0056 – Morganza Reach J-1 Levee – Project Update
a.
Reach J-1 Segment
A – Acceptance of Substantial Completion
2.
TBS Project No.
2007.1121 – Morganza Program Management Services – Update
7)
President’s
Report
8)
Adjourn
________________________
Jerome P. Zeringue, Secretary