a) Resolution No. 08-434 – Authorizing Jerome Zeringue to
sign on behalf of TLCD for the MOA-HNC Access Road & Bridge Replacement
Agreement with DOTD
b) Resolution No. 08-435 – Authorizing Anthony Alford to
sign on behalf of the Reach H-3 First Lift Agreement with DOTD
c) Morganza to the Gulf – Update
6)
Field
Superintendent’s Report
a)
In-house Projects
and Equipment – Update
b)
Authorization to
Award One Track Mounted Crawler Carrier Purchase
7)
Engineer’s Report
a)
Evans-Graves Engineers, Inc.
1.
MTG Bayou
Pointe-Aux-Chenes First Lift Levee System – Update
b)
GSE Associates, Inc.
1.
Morganza to the
Gulf – Reach J Segment 2 – Project Update
c)
1.
Bayou Pointe-Aux-Chenes
First Lift Levee System – Update on Preparation of Title Opinions
d)
Shaw Coastal, Inc.
1.
SCI Project No.
111837 – Lower Bayou Dularge Mitigation Plan Implementation
2.
SCI Project No.
111838 – Morganza to the Gulf, Reach H Permitting
3.
SCI Project No.
123771 – Reach H-Segment 3 First Lift (H-L-003)
4.
SCI Project No. 120942/125203
– Ward 7 Levee Construction
a.
Consideration of
Amendment No. 8 to Engineering Contract for Additional Construction Inspection
b.
Consideration of
Change Order No. 6 to Civil Construction Contractors, Inc. for Additional Embankment
Material and Time Extension
e)
T. Baker Smith & Son, Inc.
1.
TBS Project No.
2004.0030 – Forced Drainage Project 4-3C West – Project Update
a.
Approval of
Change Order No. 5 – Balancing Change Order decreasing contract value
2.
TBS Project No.
2001.0056 – Morganza Reach J-1 Levee – Project Update
3.
TBS Project No.
2007.1121 – Morganza Program Management Services – Update
8)
President’s
Report