meeting of the Planning & Projects Committee of the Board of
1)
Meeting called to
order
2)
Roll Call
3)
Public Wishing to
Address the Board
4)
Executive
Director’s Report
a)
Authorization to
Surplus Sheet Pile Material from the Reach J-1 Levee Project
b) Authorization to issue Task Order PSI-05 for
Geotechnical Work on the HNC Lock Access Road
c) NOAA Presentation Hosted by TLCD and TPCG to be held
on Friday, January 25, 2008
d) Morganza to the Gulf – Update
5)
Field
Superintendent’s Report
a) In-house Projects and Equipment – Update
b)
Authorization to Purchase
one Track Mounted Crawler Carrier
c)
Authorization to
Purchase two Pick-up trucks on State Contract
6)
Engineer’s Report
a)
Evans-Graves Engineers, Inc.
1.
MTG Bayou Pointe-Aux-Chenes
Floodgate Project – Update
b)
GSE Associates, Inc.
1.
Morganza to the
Gulf – Reach J Segment 2 – Project Update
c)
1.
Morganza to the
Gulf Hurricane Protection Project
2.
Bayou
Pointe-Aux-Chenes First Lift Levee System – Update on Preparation of Title
Opinions
d)
Shaw Coastal, Inc.
1.
SCI Project No.
1624 – Bayou Black Levee and Pump Station (Reach II)
2.
SCI Project No.
111837 – Lower Bayou Dularge Mitigation Plan Implementation
3.
SCI Project No.
111838 – Morganza to the Gulf, Reach H Permitting
4.
SCI Project No.
123771 – Reach H-Segment 3 First Lift (H-L-003)
5.
SCI Project No. 120942/125203
– Ward 7 Levee Construction
6.
Approval of the
Scope of Work for the Upper Ward 7 Mitigation Project
e)
T. Baker Smith & Son, Inc.
1.
TBS Project No.
2004.0030 – Forced Drainage Project 4-3C West – Project Update
2.
TBS Project No.
2004-0029 – Ward 7 Lower Forced Drainage 5-1A Levee
a.
Contract 1 –
Station 0+00 to 137+00
b.
Contract 2 –
Station 137+00 to 271+70
3.
TBS Project No.
2001.0056 – Morganza Reach J-1 Levee – Project Update
4.
TBS Project No.
2007.1121 – Morganza Program Management Services – Approval of Amendment to
Contract in the amount of $100,000
7)
President’s
Report
8)
Adjourn
________________________
Jerome P. Zeringue, Secretary